After significantly lengthy delays and mistakes for over a 7 month period made by Home Depot and Fabritech, this kitchen installation was finally finished! Two bathrooms were also installed in this newly built home.
Drywall finished.
Available cabinets installed.
Countertops built.
Floors tiled.
Finished.
Drywall finished.
Available cabinets installed.
Finished.
Available cabinets installed.
Countertops built.
Finished.
Finished.
Finished.
Finished.
Floors being prepped.
Floors tiled.
Finished.
Floors being prepped.
Floors tiled.
Finished.
Floors being prepped.
Floors tiled.
Finished.
Finished.
Finished.
Finished.
Floors being prepped.
Floors tiled.
Finished.
Before.
After.
Tub/shower.
Vanity finished.