This outdated bathroom was in dire need of a make over. Two interior walls were removed to open up the space and linen cabinet added to the end of the new vanity to allow for some needed storage space as well as additional lighting added throughout to brighten up the space.
Author: Admin
-

Aberdeen Bathroom Install
No expense spared in this truly one of a kind bathroom install. Floor to ceiling tile, corner Jacuzzi tub with LED underwater lighting, floating vanity and heated tile floors all the way through into the barrier free shower complete with 20″ ceiling mounted rain shower.
-

Juniper Kitchen Reno
After the home owner had removed some interior walls to make the main living areas open concept we tasked with installing new kitchen cabinets and fixtures, flooring and a replacing a small corner shower with a more spacious tiled one. The homeowners were almost finished painting when the after photos were taken unfortunately but the finished product turned out great.
-

Paul Lake Bathroom Renos
Before and after’s of a total removal and reinstall of two back to back bathrooms. Brand new fixtures throughout, improved layouts and heated tile floors in both bathrooms.
Ensuite beforeEnsuite finishedEnsuite beforeEnsuite finishedEnsuite beforeEnsuite finishedEnsuite finishedMain bathroom beforeMain bathroom finishedMain bathroom beforeMain bathroom finishedMain bathroom beforeMain bathroom finishedMain bathroom beforeMain bathroom finishedMain bathroom finishedMain bathroom finished -

Downtown In-Law Suite
Converting a basement workshop and storage area into a one bedroom in-law suite in this complete over haul had many challenges. 7 foot high ceilings, cast iron plumbing and 7 foot high exterior concrete walls just to name a few. In the end the whole project came together quite nicely.
-

Pinantan Ensuite Reno
Open concept was the theme with this spectacular bathroom remodel. One interior wall was removed and walk in shower with glass doors in place of an old one piece bathtub practically made the space double in size. The luxurious shower features a built in shower cubby, integrated bench and led lighting.
-

Brock Bathroom Reno
Part of a whole house renovation this complete overhaul of the master bathroom turned out fantastic. The cheater ensuite door was sealed of to enhance the layout. Interior wall was removed to open up the space and make way for a beautiful luxury shower complete with built in bench and body sprays.
-

Aberdeen Basement Finishing
Finishing an unfinished basement in a new home in Aberdeen. This basement features a large master bedroom with walk-in closet and luxurious 4 piece ensuite as well as large rec room with 2 piece bathroom and wet bar.
-

Lyon St. Flip
A whole house updated top to bottom, inside in and out in this Northern BC Flip. A collaboration with Aesthetics Drywall in Prince George brought this neglected home back to it former glory and then way past it. Walls between the kitchen, living and dining room areas were removed to create a more open feel. The entire house was stripped down to the drywall and new everything installed from there out. A new coat of paint outside, fascia, gutters, a new fence, added parking and some general maintenance to the lawn completed the exterior improvements of this truly one of a kind northern home.

