Complete tear out and new everything in this very roomy, very dated bathroom. Floors in main hallways were also torn out and re-tiled along with a new handrail.
Author: Admin
-

Springhill Kitchen Reno
An extensive renovation to a very dated and cramped kitchen. The entire kitchen was gutted along with two walls and three headers removed to create a functional, open concept kitchen.
BeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterBeforeMidwayAfterFinishedFinishedFinishedFinishedFinishedFinishedFinishedFinishedFinishedFinished -
Rose Hill Hardscaping
11 terraced retaining walls with stairs and 1750 sq/ft of paving stones made for on massive hardscaping project. Both the walls and paving stones feature blended colors and intricate patterns. Once again unfortunately, due to a cell phone meeting an early demise some of the before photos of the walls were lost.
-

Texas Creek Interior Finishing
After significantly lengthy delays and mistakes for over a 7 month period made by Home Depot and Fabritech, this kitchen installation was finally finished! Two bathrooms were also installed in this newly built home.
Drywall finished.Available cabinets installed.Countertops built.Floors tiled.Finished.Drywall finished.Available cabinets installed.Finished.Available cabinets installed.Countertops built.Finished.Finished.Finished.Finished.Floors being prepped.Floors tiled.Finished.Floors being prepped.Floors tiled.Finished.Floors being prepped.Floors tiled.Finished.Finished.Finished.Finished.Floors being prepped.Floors tiled.Finished.Before.After.Tub/shower.Vanity finished. -

McDougal Condo Reno
A complete remodel of a two story condo. The kitchen layout was improved to allow for increased counter space and built in dishwasher. In the living room a built in fireplace and entertainment center were added to add a little comfort and warmth to the space. The bathroom before pictures were unfortunately deleted but he whole room was also gutted and redone.
-

Covered Entrance Restoration
Rebuilding a flat roof cover a main entrance. The flat roof was neglected and leaked and cause rot in the structure. Rotten materials was removed and replaced and a new peaked roof was built to properly shed water and to add some curb appeal.